the railings require him to cut the wood, make the precise pieces, assemble them, remove the bridge and apply the railings, and then returning the bridge,
the tree trunk just requires him to swing the axe, dig out the middle (probably in one swing of the plow) and punch a few holes into the sides.
with the options available to him the tree was less work and time